Costing made easy
Profitability Starts with Accurate Costing. uTraxx uses AI to automatically calculate the most cost-effective production route – without manual input, within seconds.
Fully automated imposition
One click – and the system checks materials, calculates costs, and generates the imposition on the cylinder. Based on the product and your machines, AI determines the most cost-effective options within seconds. Every employee reaches the same result – and your customer receives a quote faster.


Fully automated imposition
The system calculates the optimal imposition layout within seconds. Job data is analysed in real time – no manual calculations required. Waste is minimised, material costs are reduced – all tailored to the press and production specifications. This reduces errors and ensures optimal use of your resources.
CF2-Import
With CF2 import, you can transfer die-cutting contours from CF2 files exported from CAD software. The system automatically generates the appropriate imposition layout and calculates the job based on this data. This saves time in prepress, prevents errors, and ensures a smooth data handover to production.


Costing based on item lists
Upload the item list, receive the sheet layout – automatically and efficiently. The system analyses the data, calculates optimal utilization, and generates the corresponding print sheet. Less material, less effort, fewer errors – with full flexibility for adjustments.
Häufig gestellte Fragen (FAQs)
What data does the system need for accurate costing?
Format, number of pages, colour specifications, and material – that's all it takes to calculate the most cost-effective production route.
Can I adjust or override the proposed costing manually?
Yes. You can change the suggested production route at any time – for example, by modifying processes or materials. The system remains flexible and allows for individual decisions.
Does the system support different printing processes and materials?
Yes. uTraxx is tailored to your equipment and materials. Your processes, substrates, and finishing options are stored in the system – all costings are based on the resources actually available in your operation.
